{"id":1650,"date":"2019-07-12T02:37:48","date_gmt":"2019-07-12T07:37:48","guid":{"rendered":"https:\/\/www.emag.com\/blog\/en\/?p=1650"},"modified":"2025-02-25T03:25:02","modified_gmt":"2025-02-25T09:25:02","slug":"turning-center-vl1twin-transmission-components","status":"publish","type":"post","link":"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/","title":{"rendered":"Complete Line Solutions with the VL 1 TWIN: Massively Reduce Unit Costs for Planetary Gears"},"content":{"rendered":"<p>How can commonly mass-produced transmission components, such as planetary gears be produced even more efficiently? The EMAG Group provides a customized answer to this question with the development of the twin-spindle pick-up turning center, VL\u00a01\u00a0TWIN. It machines two identical components simultaneously in the same machining area. This technology opens up a wide range of possibilities: When two machines are combined in a line, the planetary gear can be machined from two sides\u2014and all that is completed with shorter cycle times. What exactly does the line solution for planetary gears look like?<\/p>\n<p><!--more--><\/p>\n<h2><strong>Planetary Gear: Two Finished Parts Every 20 Seconds<\/strong><\/h2>\n<p>What exactly does a VL\u00a01\u00a0TWIN line solution for the soft machining of planetary gears look like? The process is generally run on two machines that are connected to each other via a TrackMotion automation system. The associated TransLift (a lifting and rotating carriage with an electric gripper) simultaneously picks up two raw parts from the feeding conveyor and transports them to the first machine. The VL\u00a01\u00a0TWIN\u2019s two pick-up spindles then take over and place the components into the machining area. The turning operation then follows on the first side of the inside and outside diameters (OP\u00a010 \u2013 OP\u00a010). The diameter and length (X\/Z directions) of both workpieces can be readjusted independently of each other, since the headstocks can traverse autonomously. This is particularly important after a tool change to compensate for deviations (e.g. after replacing the indexable inserts).<\/p>\n<div data-sliderid=\"4659\" id=\"penci-post-gallery__4659\" class=\"penci-post-gallery-container justified column-4\" data-height=\"150\" data-margin=\"3\"><a class=\"penci-gallery-ite item-gallery-justified\" href=\"https:\/\/www.emag.com\/blog\/en\/wp-content\/uploads\/sites\/2\/2019\/07\/201907G454V1_emo.jpg\" data-rel=\"penci-gallery-image-content\"  data-cap=\"Production line with two VL 1 TWINs for planetary gears: The overall process has a complete cycle time of about 20 seconds for two components.\"><img decoding=\"async\" src=\"https:\/\/www.emag.com\/blog\/en\/wp-content\/uploads\/sites\/2\/2019\/07\/201907G454V1_emo-585x414.jpg\" alt=\"Manufacturing line with two VL 1 TWINs for planetary gears\" title=\"VL 1 TWIN Manufacturing Line\"><div class=\"caption\">Production line with two VL 1 TWINs for planetary gears: The overall process has a complete cycle time of about 20 seconds for two components.<\/div><\/a><a class=\"penci-gallery-ite item-gallery-justified\" href=\"https:\/\/www.emag.com\/blog\/en\/wp-content\/uploads\/sites\/2\/2019\/07\/VL-1-TWIN_Turning_x_workarea.jpg\" data-rel=\"penci-gallery-image-content\"  data-cap=\"Massively reduce unit costs for planetary gears with the VL 1 TWIN, twin-spindle pick-up turning center from EMAG.\"><img decoding=\"async\" src=\"https:\/\/www.emag.com\/blog\/en\/wp-content\/uploads\/sites\/2\/2019\/07\/VL-1-TWIN_Turning_x_workarea-585x878.jpg\" alt=\"VL 1 TWIN turning center from EMAG for transmission components\" title=\"VL 1 TWIN Turning Center\"><div class=\"caption\">Massively reduce unit costs for planetary gears with the VL 1 TWIN, twin-spindle pick-up turning center from EMAG.<\/div><\/a><a class=\"penci-gallery-ite item-gallery-justified\" href=\"https:\/\/www.emag.com\/blog\/en\/wp-content\/uploads\/sites\/2\/2019\/07\/Taktzeiten_EN.jpg\" data-rel=\"penci-gallery-image-content\"  data-cap=\"Cycle times for a variety of workpieces on the twin-spindle pick-up turning center VL 1 TWIN  \"><img decoding=\"async\" src=\"https:\/\/www.emag.com\/blog\/en\/wp-content\/uploads\/sites\/2\/2019\/07\/Taktzeiten_EN-585x381.jpg\" alt=\"Cycle times for a variety of workpieces on the VL 1 TWIN turning center\" title=\"VL 1 TWIN Turning Center\u2014Cycle Times\"><div class=\"caption\">Cycle times for a variety of workpieces on the twin-spindle pick-up turning center VL 1 TWIN  <\/div><\/a><a class=\"penci-gallery-ite item-gallery-justified\" href=\"https:\/\/www.emag.com\/blog\/en\/wp-content\/uploads\/sites\/2\/2019\/07\/F839V0.jpg\" data-rel=\"penci-gallery-image-content\"  data-cap=\"Two pick-up spindles are used to pick up both components from the feeding conveyor, transport them into the machining area and machine them simultaneously in the same clamping operation.\"><img decoding=\"async\" src=\"https:\/\/www.emag.com\/blog\/en\/wp-content\/uploads\/sites\/2\/2019\/07\/F839V0-585x390.jpg\" alt=\"VL 1 TWIN Turning Center\u2014Pick-Up Spindles\" title=\"Pick-Up Spindles\"><div class=\"caption\">Two pick-up spindles are used to pick up both components from the feeding conveyor, transport them into the machining area and machine them simultaneously in the same clamping operation.<\/div><\/a><\/div>\n<p>Once the two semi-finished components have been transported out of the machine compartment, the TransLift takes over again to turn them by 180 degrees and transport them to the second VL\u00a01\u00a0TWIN. This is where the second side of the outside diameter is turned on its face (OP\u00a020 \u2013 OP\u00a020). The TrackMotion automation system then finally places the finished component on the conveyor belt, which can hold up to 400 finished parts on the integrated stacker units. The overall process is completed within a cycle time of about 20 seconds for two components. The average chip-to-chip time is just under 5 seconds. This tremendous pace is made possible by a series of technical configuration details: The two pick-up spindles feature high power values of 9.9\u00a0kW (13 hp) and 136\u00a0Nm (100 ft-lbs) at 40% duty cycle.<\/p>\n<p>At the same time, the wear-free linear drive in the X-axis (in combination with the direct distance measuring systems) has a high acceleration of 8\u00a0m\/s<sup>2<\/sup> (26 ft\/s<sup>2<\/sup>) -including long-term accuracy. This allows for controlled manufacturing of the frequently required H6 fits of the main drill hole.<\/p>\n<h3><strong>Perfect Solution for Transmission Production<\/strong><\/h3>\n<p>Overall, the TWIN approach allows for enormous increases in productivity for a whole series of components\u2014from cam elements to bearing rings all the way to flanges. Depending on the requirements, we can also create multi-technology production lines that include EMAG hobbing and deburring machines, for instance.<\/p>\n<p><a href=\"https:\/\/www.emag.com\/machines\/turning-machines\/multi-spindle-automatics\/vl-1-twin-vlc-50-twin.html\" target=\"_blank\" rel=\"noopener\"><span style=\"color: #0000ff\">More information on VL\u00a01\u00a0TWIN<\/span><\/a><\/p>\n<hr \/>\n<h3><strong>The VL\u00a01 TWIN live at the EMO 2019<\/strong><\/h3>\n<p><img decoding=\"async\" class=\"alignleft size-full wp-image-2064\" src=\"https:\/\/www.emag.com\/blog\/wp-content\/uploads\/2019\/07\/csm_EMO2019_d79fe38013.png\" alt=\"EMAG auf der EMO 2019\" width=\"224\" height=\"190\" \/>Visit EMAG at the EMO 2019 in hall\u00a017, at booth\u00a0C29 and see first-hand the benefits of the VL\u00a01\u00a0TWIN\u2019s performance.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>How can commonly mass-produced transmission components, such as planetary gears be produced even more efficiently? The EMAG Group provides a customized answer to this&hellip;<\/p>\n","protected":false},"author":13,"featured_media":1651,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"video","meta":{"_lmt_disableupdate":"","_lmt_disable":"","editor_notices":[],"footnotes":""},"categories":[2615,42],"tags":[94,1160,56],"class_list":["post-1650","post","type-post","status-publish","format-video","has-post-thumbnail","hentry","category-machines","category-technologies","tag-car-manufacturing","tag-emo-2019","tag-vertical-turning-machine","post_format-post-format-video"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>VL 1 TWIN turning center for the production of transmission components<\/title>\n<meta name=\"description\" content=\"Massively reduce unit costs for planetary gears with the VL 1 TWIN twin-spindle pick-up turning center from EMAG. Live at EMO 2019.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"VL 1 TWIN turning center for the production of transmission components\" \/>\n<meta property=\"og:description\" content=\"Massively reduce unit costs for planetary gears with the VL 1 TWIN twin-spindle pick-up turning center from EMAG. Live at EMO 2019.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/\" \/>\n<meta property=\"og:site_name\" content=\"EMAG Group - Company Blog\" \/>\n<meta property=\"article:published_time\" content=\"2019-07-12T07:37:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-25T09:25:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.emag.com\/blog\/en\/wp-content\/uploads\/sites\/2\/2019\/07\/201907G454V1_emo.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"724\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Oliver Hagenlocher\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Oliver Hagenlocher\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/\"},\"author\":{\"name\":\"Oliver Hagenlocher\",\"@id\":\"https:\/\/www.emag.com\/blog\/en\/#\/schema\/person\/9ae8c8fc62dc80b80a172bf9b201adb6\"},\"headline\":\"Complete Line Solutions with the VL 1 TWIN: Massively Reduce Unit Costs for Planetary Gears\",\"datePublished\":\"2019-07-12T07:37:48+00:00\",\"dateModified\":\"2025-02-25T09:25:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/\"},\"wordCount\":523,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.emag.com\/blog\/en\/wp-content\/uploads\/sites\/2\/2019\/07\/201907G454V1_emo.jpg\",\"keywords\":[\"car manufacturing\",\"EMO 2019\",\"Vertical Turning Machine\"],\"articleSection\":[\"Machines\",\"Technologies\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/\",\"url\":\"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/\",\"name\":\"VL 1 TWIN turning center for the production of transmission components\",\"isPartOf\":{\"@id\":\"https:\/\/www.emag.com\/blog\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.emag.com\/blog\/en\/wp-content\/uploads\/sites\/2\/2019\/07\/201907G454V1_emo.jpg\",\"datePublished\":\"2019-07-12T07:37:48+00:00\",\"dateModified\":\"2025-02-25T09:25:02+00:00\",\"author\":{\"@id\":\"https:\/\/www.emag.com\/blog\/en\/#\/schema\/person\/9ae8c8fc62dc80b80a172bf9b201adb6\"},\"description\":\"Massively reduce unit costs for planetary gears with the VL 1 TWIN twin-spindle pick-up turning center from EMAG. Live at EMO 2019.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/#primaryimage\",\"url\":\"https:\/\/www.emag.com\/blog\/en\/wp-content\/uploads\/sites\/2\/2019\/07\/201907G454V1_emo.jpg\",\"contentUrl\":\"https:\/\/www.emag.com\/blog\/en\/wp-content\/uploads\/sites\/2\/2019\/07\/201907G454V1_emo.jpg\",\"width\":1024,\"height\":724,\"caption\":\"Production line with two VL 1 TWINs for planetary gears: The overall process has a complete cycle time of about 20 seconds for two components.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.emag.com\/blog\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Complete Line Solutions with the VL 1 TWIN: Massively Reduce Unit Costs for Planetary Gears\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.emag.com\/blog\/en\/#website\",\"url\":\"https:\/\/www.emag.com\/blog\/en\/\",\"name\":\"EMAG Group - Company Blog\",\"description\":\"Articles on machines, technologies and more\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.emag.com\/blog\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.emag.com\/blog\/en\/#\/schema\/person\/9ae8c8fc62dc80b80a172bf9b201adb6\",\"name\":\"Oliver Hagenlocher\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.emag.com\/blog\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.emag.com\/blog\/wp-content\/uploads\/2024\/12\/cropped-Blog_Oli_200x200px-96x96.jpg\",\"contentUrl\":\"https:\/\/www.emag.com\/blog\/wp-content\/uploads\/2024\/12\/cropped-Blog_Oli_200x200px-96x96.jpg\",\"caption\":\"Oliver Hagenlocher\"},\"url\":\"https:\/\/www.emag.com\/blog\/en\/author\/ylansky\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"VL 1 TWIN turning center for the production of transmission components","description":"Massively reduce unit costs for planetary gears with the VL 1 TWIN twin-spindle pick-up turning center from EMAG. Live at EMO 2019.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/","og_locale":"en_US","og_type":"article","og_title":"VL 1 TWIN turning center for the production of transmission components","og_description":"Massively reduce unit costs for planetary gears with the VL 1 TWIN twin-spindle pick-up turning center from EMAG. Live at EMO 2019.","og_url":"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/","og_site_name":"EMAG Group - Company Blog","article_published_time":"2019-07-12T07:37:48+00:00","article_modified_time":"2025-02-25T09:25:02+00:00","og_image":[{"width":1024,"height":724,"url":"https:\/\/www.emag.com\/blog\/en\/wp-content\/uploads\/sites\/2\/2019\/07\/201907G454V1_emo.jpg","type":"image\/jpeg"}],"author":"Oliver Hagenlocher","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Oliver Hagenlocher","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/#article","isPartOf":{"@id":"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/"},"author":{"name":"Oliver Hagenlocher","@id":"https:\/\/www.emag.com\/blog\/en\/#\/schema\/person\/9ae8c8fc62dc80b80a172bf9b201adb6"},"headline":"Complete Line Solutions with the VL 1 TWIN: Massively Reduce Unit Costs for Planetary Gears","datePublished":"2019-07-12T07:37:48+00:00","dateModified":"2025-02-25T09:25:02+00:00","mainEntityOfPage":{"@id":"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/"},"wordCount":523,"commentCount":0,"image":{"@id":"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/#primaryimage"},"thumbnailUrl":"https:\/\/www.emag.com\/blog\/en\/wp-content\/uploads\/sites\/2\/2019\/07\/201907G454V1_emo.jpg","keywords":["car manufacturing","EMO 2019","Vertical Turning Machine"],"articleSection":["Machines","Technologies"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/","url":"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/","name":"VL 1 TWIN turning center for the production of transmission components","isPartOf":{"@id":"https:\/\/www.emag.com\/blog\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/#primaryimage"},"image":{"@id":"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/#primaryimage"},"thumbnailUrl":"https:\/\/www.emag.com\/blog\/en\/wp-content\/uploads\/sites\/2\/2019\/07\/201907G454V1_emo.jpg","datePublished":"2019-07-12T07:37:48+00:00","dateModified":"2025-02-25T09:25:02+00:00","author":{"@id":"https:\/\/www.emag.com\/blog\/en\/#\/schema\/person\/9ae8c8fc62dc80b80a172bf9b201adb6"},"description":"Massively reduce unit costs for planetary gears with the VL 1 TWIN twin-spindle pick-up turning center from EMAG. Live at EMO 2019.","breadcrumb":{"@id":"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/#primaryimage","url":"https:\/\/www.emag.com\/blog\/en\/wp-content\/uploads\/sites\/2\/2019\/07\/201907G454V1_emo.jpg","contentUrl":"https:\/\/www.emag.com\/blog\/en\/wp-content\/uploads\/sites\/2\/2019\/07\/201907G454V1_emo.jpg","width":1024,"height":724,"caption":"Production line with two VL 1 TWINs for planetary gears: The overall process has a complete cycle time of about 20 seconds for two components."},{"@type":"BreadcrumbList","@id":"https:\/\/www.emag.com\/blog\/en\/turning-center-vl1twin-transmission-components\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.emag.com\/blog\/en\/"},{"@type":"ListItem","position":2,"name":"Complete Line Solutions with the VL 1 TWIN: Massively Reduce Unit Costs for Planetary Gears"}]},{"@type":"WebSite","@id":"https:\/\/www.emag.com\/blog\/en\/#website","url":"https:\/\/www.emag.com\/blog\/en\/","name":"EMAG Group - Company Blog","description":"Articles on machines, technologies and more","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.emag.com\/blog\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.emag.com\/blog\/en\/#\/schema\/person\/9ae8c8fc62dc80b80a172bf9b201adb6","name":"Oliver Hagenlocher","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.emag.com\/blog\/en\/#\/schema\/person\/image\/","url":"https:\/\/www.emag.com\/blog\/wp-content\/uploads\/2024\/12\/cropped-Blog_Oli_200x200px-96x96.jpg","contentUrl":"https:\/\/www.emag.com\/blog\/wp-content\/uploads\/2024\/12\/cropped-Blog_Oli_200x200px-96x96.jpg","caption":"Oliver Hagenlocher"},"url":"https:\/\/www.emag.com\/blog\/en\/author\/ylansky\/"}]}},"_links":{"self":[{"href":"https:\/\/www.emag.com\/blog\/en\/wp-json\/wp\/v2\/posts\/1650","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.emag.com\/blog\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.emag.com\/blog\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.emag.com\/blog\/en\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.emag.com\/blog\/en\/wp-json\/wp\/v2\/comments?post=1650"}],"version-history":[{"count":4,"href":"https:\/\/www.emag.com\/blog\/en\/wp-json\/wp\/v2\/posts\/1650\/revisions"}],"predecessor-version":[{"id":2889,"href":"https:\/\/www.emag.com\/blog\/en\/wp-json\/wp\/v2\/posts\/1650\/revisions\/2889"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.emag.com\/blog\/en\/wp-json\/wp\/v2\/media\/1651"}],"wp:attachment":[{"href":"https:\/\/www.emag.com\/blog\/en\/wp-json\/wp\/v2\/media?parent=1650"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.emag.com\/blog\/en\/wp-json\/wp\/v2\/categories?post=1650"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.emag.com\/blog\/en\/wp-json\/wp\/v2\/tags?post=1650"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}